Interior demolition photos from February 2014 – June 2014. 

Part of the scope-of-work was the protection and restoration of the existing woodwork throughout the home.  The Cellar, Basement, Second and third floor level went under major demolition.    

During the course of demolition, the design plans had to be revised on the Basement Level to provide the client with a more efficient plan as well as addressing issues discovered in the field. Adjacent to the garden, located on the north wall of the home, a fireplace was discovered behind the existing walls.  Modifications were made to the design to allow this fireplace to be restored and fully operational with steel windows installed on either side.